20Y-Timeline Gantt: test scenarios

Supplemental viewport/theme observations and live-checkout limitations: catalog evidence matrix. Apply shared shell cases alongside these cases; see findings for current failures.

Route: /demo/gantt-horizontal-big-data

This example is a bare Gantt grid with one task-name column, generated tasks, dependencies and an every-day UTC calendar. There is no custom search, dataset chooser, reset, performance panel or zoom toolbar in its Vue template. The fixture contains 100 tasks and 194 dependencies, spanning 2026-01-01 to 2045-12-31, using month-quarter zoom. Reload resets plugin edits.

Review evidence and execution contract

  • Reviewed on 2026-09-08, docs revision b0c0bd9f851772dfcd30549d6d0a71ab84be12f6; pre-existing uncommitted theme changes in DemoNavigation.vue and style.scss were present and were not changed by this review.
  • Local target: http://127.0.0.1:4173. Browser evidence is recorded below; a scenario marked source-derived has not been executed merely because its initial page was opened.
  • Start each independent case in a fresh browser context and reload its route. Use fixed viewport/theme pairs for repeatable checks. The central review records baseline screenshots for every route at 1440×900/dark and 1280×720/light; use the central evidence matrix for narrow-screen inspection coverage. Do not share browser storage or modified fixtures between tests.
  • Await the specific visible grid, its first real row/bar/event, and completion of filtering before interacting. Scope selectors to this demo; use stable task/event IDs, never assume a virtual DOM row index identifies a record after scrolling or filtering. Collect page errors and failed asset loads throughout.

Browser verification

Baseline screenshot coverage also includes 1440×900/dark and 1280×720/light for this route, as recorded by the central reviewer. Baseline inspection does not imply that every interaction below ran at both settings; narrow-screen evidence is tracked centrally.

Central reviewer opened and inspected screenshots at 1280×720, light theme on 2026-09-08. Program task 001 and following rows rendered initially. Four pages of rightward timeline scrolling advanced headers to January–June 2033 while the task-name column remained on initial 001-series rows. Blank bars at that position are expected because those early tasks fall outside the visible date range. Reaching 2045, scrolling to a matching future task and returning to origin were not executed.

Source and existing coverage

The package E2E has a mount/data-contract test for this multi-example host. Docs suite currently checks shared-shell mount. Neither establishes complete scrolling/editing behavior inside the docs shell.

Scenarios

GANTT20Y-01 — Initial dataset and visible timeline (P0)

Evidence: Executed initial screenshot: Program task 001 and subsequent rows render. Exact model/dependency counts remain source-derived.

Setup/reset: Fresh route, desktop baseline.

  1. Wait for .gantt-horizontal-big-data-grid and first task row/bar ⇒ Program task 001 appears with matching timeline content.
  2. Inspect model through documented grid/plugin data access ⇒ exactly 100 real tasks and 194 dependencies; the DOM contains only the rendered subset.
  3. Inspect date headers ⇒ month/quarter labels are ordered, and fixture is anchored in 2026 rather than the review date.

Visual checks: Name column is readable and timeline occupies remaining width; bars connect to corresponding rows; no loading overlay remains.

Automation/readiness: Use grid class plus visible bar readiness. Source task count and mounted row count are different contracts; avoid asserting all rows exist in DOM.

GANTT20Y-02 — Vertical scrolling reaches distant records (P0)

Evidence: Executed in the docs host: Page Down replaced Program task 001 with later virtualized rows while a Gantt bar remained rendered.

Setup/reset: Reload and start at top.

  1. Scroll down several viewport heights ⇒ first visible task identity changes and bars/dependency segments track the new rows.
  2. Scroll to the bottom ⇒ Program task 100 becomes reachable with corresponding timeline row; scroll back to top ⇒ Program task 001 returns.
  3. Repeat down/up twice ⇒ no repeated/missing row labels, frozen viewport or accumulating ghost bars.

Visual checks: Review fast-scroll settled frames for white holes, mismatched task/bar rows, clipped final row and pinned-name alignment.

Automation/readiness: Capture visible stable IDs before and after scroll. For 10K data, incremental wheel alone is slow; use real scroll thumb/keyboard navigation and assert resulting IDs. Wait on changed rendered content, not arbitrary fixed sleeps.

GANTT20Y-03 — Horizontal timeline range and return (P0)

Evidence: Executed four pages rightward: January–June 2033 headers with initial task labels retained. Far-right 2045, matching-row alignment and origin return remain unexecuted.

Setup/reset: Reload. Program task 001 starts 2026-01-01; Program task 100 starts/ends 2045-12-31.

  1. Scroll timeline right toward 2045 ⇒ headers advance monotonically through years and quarters; table column remains pinned.
  2. Scroll vertically to a task in that range ⇒ its bar becomes visible once both row and date are in view. An early task with an offscreen date may correctly have no visible bar.
  3. Scroll left to origin ⇒ original headers and first task bar return without stale far-future labels.

Visual checks: Header/body horizontal positions agree; no enormous DOM-wide blank area overlays the table. A 20-year program is not expected to fit on one screen; one-day last task must still be discoverable.

Automation/readiness: Use horizontal viewport/scrollbar inside grid. Future performance checks should assert bounded rendered columns/segments relative to viewport, not enforce a guessed fixed FPS or total screenshot width.

GANTT20Y-04 — Inspect and edit a virtualized task (P1)

Evidence: Source-derived; not executed in this review.

Setup/reset: Fresh load; choose Program task 001.

  1. Open first task using the visible task editor affordance ⇒ correct task identity and dates appear.
  2. Rename to QA virtual task and save ⇒ table updates once; scroll away and back ⇒ name persists for same ID.
  3. Cancel a second rename ⇒ prior committed name remains; reload ⇒ seed label returns.

Visual checks: Editor stays inside viewport and does not inherit giant timeline dimensions; selected row is not confused with a recycled DOM row.

Automation/readiness: The Vue component supplies GanttPlugin without custom edit handlers; this is a proposed plugin integration check, not an already-observed guarantee. Resolve editor affordance from actual UI before coding test.

GANTT20Y-05 — Responsive/theme and repeated navigation (P1)

Evidence: Baseline screenshots inspected at 1440×900/dark and 1280×720/light. The combined Code-drawer, scrolling and repeated-navigation sequence below remains source-derived; narrow-screen evidence is recorded centrally.

Setup/reset: Independent reload for desktop/light, desktop/dark and 390×844.

  1. Open this demo from another docs route ⇒ dataset mounts once and does not retain the prior demo layout.
  2. Scroll vertically/horizontally and open/close Code drawer ⇒ date headers, task list and scroll controls remain usable.
  3. Navigate away and return twice ⇒ correct first task/fixture returns; no duplicated grid or lingering overlay.

Visual checks: Check row separation, dependency contrast and header readability in dark mode; narrow layouts may scroll within grid but should not overflow the whole page.

Automation/readiness: Record screenshot and actual viewport/theme per run. Collect page errors; use condition-based readiness and broad timeouts for cold load. Do not claim performance success from an image byte-length check.